Project

On-Going Projects-Status Upto Dec. 2019

SL HeadNo. of ProjectsAmount (in Crores)
1 Additional Central Assistance 0 0.00
2 Central Road Fund 2 1580.80
3 Nabard Loan 17 29626.44
4 R.O.B. 1 27.27
5 Karpuri Chatrawas 20 54.80
6 Non-Plan 4 2264.28
7 B.D.F 2 3314.93
8 BVVK 0 0.00
9 Flood Shelter 18 17.15
10 World Bank(Phase-II) 24 214.93
11 Deposit 7 104.70
12 MMSNY 10 3398.31
13 FDR 45 52479.79
14 MMKVY 1 41.13
15 State Plan 34 67730.39
 Total:185160854.92

Completed Projects - during 2019-20 (upto Dec.-2019)

(Amount in Rs. Crores)
SL NameNo. of ProjectsAmount
1 Additional Central Assistance 0 0.00
2 Central Road Fund 0 0.00
3 Nabard Loan 13 80.57
4 R.O.B. 0 0.00
5 Karpuri Chatrawas 2 7.13
6 Non-Plan 0 0.00
7 B.D.F 0 0.00
8 BVVK 0 0.00
9 Flood Shelter 3 2.93
10 World Bank(Phase-II) 11 116.53
11 Deposit 3 18.53
12 MMSNY 6 26.49
13 FDR 5 26414.66
14 MMKVY 6 17.94
15 State Plan 30 1118.86
 Total:7927803.64

Work Force

Posts of Chief Engineer to Junior Engineer of Engineering Cadre of Nigam are being held by officers on deputation from Road Construction Department of Govt. of Bihar. At present, working strength of Engineering Cadre is as follows:
SL Rank/DesignationSanctioned StrengthWorking Strength
1 Chief Engineer 1 1
2 Superintending Engineer 4 4
3 Executive Engineer 23 23
4 Assistant Engieer 66 46
5 Junior Engineer 102 76
 Total:196150

In other cadres, officers and staffs appointed by Nigam are working and their strength is as shown below:

SL CadresStrength
1 Class-I (FA) 1
2 Class-II 4
3 Class-III 93
4 Class-IV 142
5 Work Charged Staff 115
 Total:355

Source of Income

Sources of income of Nigam are as follows:

  1. Centage charges @ 9% on the sanctioned cost of projects.
  2. Toll Collection
  3. Registration of Contractors
  4. Miscellaneous

In the field of toll collection, Nigam has collected a toll of Rs. 94.55 crores from 1975-76 to 2007-08. Out of this amount, Rs. 18.46 crores has been spent on completion of construction works of 19 projects, and Rs. 16.00 crores has been spent on different projects of other fields.